Sensverk
LanguageEN
Talk to Brian

Every signal. One optimal state.

One dashboard for your data centre's energy, cooling and compliance.

Sensverk finds the energy you're wasting and shows where every reported number comes from. Read-only, on the systems you already run.

Talk to BrianSee the dashboard ↓

“Tell me how your site runs today. In 30 minutes I'll show you where Sensverk would find energy to save.” Brian Stout, CEO

Sensverk dashboard on a laptop showing the PUE and Energy view, and on a phone showing predictive alerts, both with sample data

AI runs on data centres.
Data centres run on energy.

“The world has gone all-in on AI, and AI needs enormous amounts of compute. So the world is building data centres, and every one of them comes with a huge energy bill. Running them better saves a great deal of that energy. That's why we started Sensverk.”

Brian Stout, CEO & co-founder

  • $400bn+

    spent by the largest tech companies in 2025, as they race to build AI capacity.

  • 485 TWh

    of electricity used by the world's data centres in 2025, set to roughly double by 2030, driven by AI.

  • €0.8M

    a year saved in cooling energy at a single 10 MW site, base case (Sensverk estimate).

Demand doubles.
Efficiency stands still.

Data centres will use about twice as much electricity by 2030.

Global data-centre electricity, TWh a year. Dashed = projection.

Global data-centre electricity use, 2024, 2025 and 2030 projection (IEA) Column chart, terawatt-hours per year. 2024: 415. 2025: 485. 2030 projection: about 950, drawn dashed. Demand roughly doubles between 2025 and 2030. Source: IEA. 0 250 500 750 1,000 TWh per year 415 2024 485 2025 ≈950 projection 2030 ≈2× 2025

Source: IEA, Energy and AI (2025); Key Questions on Energy and AI (2026).

Global data-centre electricity, TWh
YearTWhStatus
2024415IEA estimate
2025485IEA estimate
2030≈950IEA projection

Their efficiency has barely moved.

Average PUE reported by operators. 1.0 would mean every kWh reaches the IT equipment.

Average data-centre PUE, 2018 to 2026 Line chart of the Uptime Institute survey average annual PUE, one point per survey year: 2018 1.58, 2019 1.67, 2020 1.59, 2021 1.57, 2022 1.55, 2023 1.58, 2024 1.56, 2025 1.54, 2026 1.52. Axis from 1.0, the ideal where all power reaches IT. The line barely moves. 1.0 1.2 1.4 1.6 1.8 2.0 Average annual PUE Overhead above 1.0: cooling, power losses 2018 2020 2022 2024 2026 1.58 1.52

Source: Uptime Institute, Global Data Center Survey 2018–2026.

Average annual PUE, Uptime Institute survey
Survey yearPUE
20181.58
20191.67
20201.59
20211.57
20221.55
20231.58
20241.56
20251.54
20261.52

Sources: IEA, Key Questions on Energy and AI (2026); Gartner (June 2026); Uptime Institute, Global Data Center Survey 2018–2026 (average PUE 1.52 in 2026); Sensverk estimate for a 10 MW IT site.

Read the full picture →

Three problems you will recognise.

Your tools show what happened, not what to do. Hyperscalers have specialist teams to turn data into action. A 10 MW operator usually doesn't.

  • You pay for cooling you don't need.

    Setpoints stay low and every unit stays on, because nobody has time to prove a change is safe.

  • Your systems don't see each other.

    The BMS, meters, UPS and DCIM each show their own part. A fault starts in one, the alarm goes off in another, and the cause stays hidden. One in five major outages costs over $1M (Uptime Institute, 2026).

  • The numbers have to hold up.

    Every figure in your EED and NIS2 reporting has to survive the question “where did this come from?”

See how Sensverk handles it ↓

One dashboard answers all three.

Sensverk reads the data your BMS, meters and DCIM already collect and turns it into one picture of your site.

  • Less cooling

    Sensverk finds the cooling you don't need, proposes safe setpoints and checks the saving against your baseline.

  • The cause

    When cooling or power starts to drift, you see the likely cause and the fix early.

  • The evidence

    Each reported figure carries its meter, timestamp and method. Gaps show before the deadline.

Brian Stout

Let's look at your site together.

If any of this sounds familiar, bring three things: your energy bill, your last EED report and the alarm nobody could explain. I'll show you what Sensverk would see in them, and we'll decide together whether it's worth a closer look.

Brian Stout, CEO

Talk to Brian →

[email protected]

I reply within two working days.